Bansang Hospital
Projects Projects

Bansang Hospital

Bansang general hospital has been struggling with power outages for a long time. Power-up Gambia together with donor Peter Giller initiated a project to provide power to the Hospital. Greenlink designed a containerized solution for the batteries and inverters.

Meer lezen
Mandina Lodge
Projects Projects

Mandina Lodge

Mandina lodge is powered by a Greenlink lease system. After very negative experiences with a solar system provided by a “leading” solar company in The Gambia, Mandina Lodge was stuck without energy, running generator to supply power to the lodge.

Meer lezen
Gambia - Bwiam Hospital
Projects Projects

Gambia - Bwiam Hospital

Greenlink Gambia reinstalled the energy system at Bwiam general hospital. Finally it works as it was intended by the manufacturer. The solar system was upgraded to the standards and expanded to 85 kWp.

Meer lezen
Gambia - Central Bank
Projects Projects

Gambia - Central Bank

The Disaster Recovery Site from the Central Bank is powered by a hybrid power supply from Greenlink. The system uses Solar, the grid backed-up by a battery bank and as a last resort a generator.

Meer lezen