Gambia - Central Bank

The Disaster Recovery Site from the Central Bank is powered by a hybrid power supply from Greenlink. The system uses Solar, the grid backed-up by a battery bank and as a last resort a generator.

Vorige
Vorige

Solar Lease - Ngala Lodge Gambia