Gambia - Bwiam Hospital
Greenlink Gambia reinstalled the energy system at Bwiam general hospital. Finally it works as it was intended by the manufacturer. The solar system was upgraded to the standards and expanded to 85 kWp. Greenlink also upgraded the power distribution to enhance the stability and safety of the system and its users.